High-End Design Build
Costo Construction was eneaged as Construction Manager and ultimately as the General Contractor on this high-end design build proejct. This suite had originally been designed by the esteemed Bob Ledingham.
We pointed to flooring suggestions and our clients were happy to choose this material.
This project included replacement of all flooring, painting throughout, upgraded lighting, decorative glass, custom millwork and metal trims to the already in place glass work.
We’re proud to say that we lived up to the referral, keeping our clients informed and happy along the way and delivering on our promises for timeline and budget.
Our management of this project resulted in everything our clients were hoping to achieve!
Photos by Phillip Crocker















High End Design Build: The Future of Luxury Construction Through Integrated Project Delivery
In the realm of luxury construction, High End Design Build has emerged as the most effective and efficient approach to delivering exceptional projects. This model, often referred to as Integrated Project Delivery (IPD), involves early collaboration among the contractor, design professionals, and client, ensuring that every aspect of the project aligns with the desired budget, quality standards, and schedule from inception.
At Costo Construction, we prioritize early engagement with architects, engineers, and consultants—becoming stakeholders in the project early on to optimize feasibility, constructability, and overall project success. This collaborative ethos not only enhances project outcomes but also minimizes risk and maximizes value for owners seeking high-end, bespoke spaces.
What Is High End Design Build?
High End Design Build refers to a project delivery method tailored specifically for luxury, high-value projects where craftsmanship, quality, and attention to detail are paramount. Unlike traditional design-bid-build methods, the High End Design Build approach integrates design and construction from the earliest phases, fostering collaboration, innovation, and cost control.
This approach involves:
Early involvement of the general contractor
A collaborative design process with architects, engineers, and consultants
Focus on premium materials, finishes, and systems
Emphasis on schedule, quality, and owner satisfaction
The Power of Integrated Project Delivery (IPD)
Integrated Project Delivery (IPD) is the cornerstone of High End Design Build. It is a highly collaborative project model where key stakeholders—including the owner, architect, engineer, and contractor—share risks and rewards, working together from conceptual design through project completion.
Supported by industry research, IPD has been shown to improve project outcomes by reducing waste, controlling costs, and enhancing quality. According to the American Institute of Architects (AIA), IPD fosters transparency, innovation, and shared accountability, leading to higher client satisfaction (https://www.aia.org/).
How Costo Construction Embraces Early Collaboration
The Early Engagement Model
At Costo Construction, our philosophy aligns with the principles of High End Design Build through early involvement. We believe that taking on a project early—prior to the completion of design—is essential for delivering a truly bespoke high-end space.
Our process typically involves:
Initial consultation with the owner to understand vision, budget, and schedule
Early engagement with architects, engineers, and consultants
Joint feasibility studies assessing site conditions, constructability, and material options
Developing preliminary budgets and schedules aligned with owner expectations
Collaborative design reviews to optimize space, systems, and finishes
Becoming Stakeholders from the Start
By engaging early, Costo Construction becomes a stakeholder—not just a builder but a consultative partner. We review design concepts for constructability, warranty issues, insurance considerations, and material selections—providing critical feedback that influences design decisions and project scope.
Supporting Source: The Construction Management Association of America (CMAA) emphasizes that early contractor involvement enhances project predictability, reduces change orders, and improves overall quality (https://cmaanet.org/).
Benefits of the High End Design Build / IPD Model
For the Owner
Cost Control:** Early estimating and value engineering prevent budget overruns.
Schedule Certainty:** Overlapping design and construction phases reduce project duration.
Quality Assurance:** Continuous collaboration ensures high craftsmanship and premium finishes.
Risk Mitigation:** Shared risks and transparent communication reduce surprises and disputes.
Innovation:** Early collaboration fosters creative solutions for complex design challenges.
For the Project Team
Improved communication and teamwork
Greater flexibility to adapt to design revisions
Greater accountability and shared incentives for success
Supporting article: A report from McGraw Hill Construction found that projects using collaborative delivery methods, including IPD, typically finish 33% faster and 10% under budget, with higher owner satisfaction (https://www.construction.com/).
How Costo Construction Facilitates High End Design Build Projects
Building the Right Team
From the outset, we assemble a team of highly qualified architects, engineers, and consultants with experience in high-end projects. We collaborate with them in early design reviews, material selections, and systems integration.
Feasibility and Constructability
Our team assesses site conditions, structural capacity, environmental factors, and code requirements. We provide early feedback regarding constructability and potential cost impacts—ensuring the project remains viable and aligned with owner goals.
Material Selection and Warranties
We advise on premium materials, finishes, and systems—from custom cabinetry to high-performance HVAC units—ensuring durability, aesthetics, and warranties are maximized.
Budget and Schedule Management
Our early involvement allows us to develop detailed budgets and schedules, with contingencies for unforeseen issues. We monitor progress continuously, adjusting plans proactively to keep the project on track.
Supporting Source: The Design-Build Institute of America (DBIA) advocates early contractor involvement as a best practice for high-end projects, citing benefits in cost, quality, and schedule (https://www.dbia.org/).
Case Study: A High-End Residential and Commercial Project
Recently, Costo Construction was engaged early in a luxury mixed-use development project, combining high-end residential interiors with commercial retail spaces. Our team collaborated with the architect and engineers from concept through construction, ensuring integration of sophisticated systems such as smart home automation, luxury finishes, and bespoke cabinetry.
By leveraging the High End Design Build model, we delivered the project on time, within scope, and exceeding client expectations—while controlling costs and minimizing waste.
Why Choose Costo Construction for Your High End Design Build Projects?
Certified Expertise:** Our certifications as a CCM and CPM demonstrate our commitment to industry-leading standards.
Collaborative Approach:** We partner early with clients, designers, and consultants to optimize outcomes.
Experience with Complex Projects:** Our portfolio includes high-end residential, commercial, hospitality, and healthcare projects.
Sustainable Focus:** We prioritize eco-friendly materials, waste reduction, and energy-efficient systems.
Client-Centric Service:** Our team is dedicated to transparency, communication, and exceeding expectations.
The Future of High End Construction: Collaboration Is Key
Industry leaders agree that High End Design Build and Integrated Project Delivery are transforming the construction landscape. The American Institute of Architects highlights that collaborative methods reduce waste, improve quality, and foster innovative solutions, especially critical in luxury projects where details matter (https://www.aia.org/).
External article support: The McGraw Hill Construction report confirms that collaborative delivery methods lead to faster completion, fewer change orders, and higher client satisfaction.
Conclusion
High End Design Build is more than a project delivery method; it is a strategic approach that combines early collaboration, transparency, and expertise to create exceptional spaces that meet the highest standards of quality, safety, and sustainability.
Costo Construction is your ideal partner for high-end projects—whether new builds or complex renovations—because we believe in becoming integrated stakeholders from the start. Our certifications, experience, and collaborative philosophy ensure your project is delivered flawlessly, on time, and within budget.
Ready to elevate your next project? Contact Costo Construction today to discover how our integrated approach can turn your vision into reality.
Resources & Further Reading